Advansys

Zohr Gas Plant

2003 2004

Overview

The Zohr Gas Plant represents the largest gas discovery ever made in Egypt and the Mediterranean Sea, with reserves exceeding 30 trillion cubic feet of gas.

Zohr Gas Plant

Challenges

  • Achieving fast-track production from exploration to market
  • Securing a local partner capable of providing responsive, on-ground support

Solution

Advansys Intelligent Solutions played a pivotal role in the project by delivering:

  • Full integration of electrical and process automation systems across 17 E-Houses
  • Engineering, design standardization, and simplification for optimized delivery
  • A unified project team overseeing design, build, delivery, and on-site execution
  • Robust cybersecurity infrastructure ensuring secure and reliable operations

Results

  • 25% faster project execution and delivery
  • Time-to-gas reduced by 50%
  • Total project timeline cut from 12 months to 9 months
  • Reduced project risk and lower operating costs
  • Seamless, cybersecure integration of power and control systems

Explore Life at Advansys

View Open Positions